• Client

    Bronte Harbor Club
  • Location

    Oakville, Ontario
  • Scope

    Pool, Change Room, and Corridor Renovation
  • Project Type

    Residential / Amenity Upgrade

Overview

McIvor Construction Management led a full revitalization of key amenity areas, including the pool, change rooms, and connecting corridors at 2511 Lakeshore Road West in Oakville. This project was about more than updating finishes — it was a full systems and infrastructure upgrade designed to enhance resident experience and long-term building value.

Infrastructure and Finishes, From the Ground Up

The scope included complete removal of existing materials, followed by new tile and waterproofing systems, plumbing rough-ins, mechanical upgrades, and fresh framing and drywall throughout. The project blended technical execution with aesthetic enhancements, creating a refreshed environment that feels both modern and built to last.

Communication That Builds Confidence

This was a resident-facing renovation, and McIvor CM made transparency a top priority. Our team met with the condo board on a weekly basis, providing detailed updates on schedule, budget, and progress. These regular touchpoints helped keep the project aligned, avoided surprises, and built strong trust with stakeholders throughout.

Delivered to Stand the Test of Time

The project team worked with professionalism and focus from start to finish, overcoming the complexities of working in a live residential building while maintaining quality control at every step. The result is a completely revitalized amenity space that enhances resident enjoyment today — and will continue to do so for decades to come.

Project Highlights

  • Amenity renovation at Bronte Harbor Club, 2511 Lakeshore Road West

  • Pool area, change rooms, and corridors fully revitalized

  • New tile, waterproofing, plumbing, mechanical, and drywall

  • Weekly condo board meetings with full transparency

  • Delivered a durable, high-quality result with a long life span


Previous

Share On